{"id":33,"date":"2013-06-10T22:19:34","date_gmt":"2013-06-10T13:19:34","guid":{"rendered":"http:\/\/www.greenaction-japan.org\/modules\/wordpress0\/index.php?p=105"},"modified":"2015-11-16T17:29:23","modified_gmt":"2015-11-16T08:29:23","slug":"is-japan-headed-for-another-fukushima-japans-nuclear-regulatory-authority-capitulates-to-electric-utility-on-earthquake-assessment","status":"publish","type":"post","link":"http:\/\/greenaction-japan.org\/en\/2013\/06\/is-japan-headed-for-another-fukushima-japans-nuclear-regulatory-authority-capitulates-to-electric-utility-on-earthquake-assessment\/","title":{"rendered":"Is Japan headed for another Fukushima?  Japan\u2019s Nuclear Regulatory Authority Capitulates to Electric Utility on Earthquake Assessment"},"content":{"rendered":"\n<p><center><\/p>\n<h1>Is Japan headed for another Fukushima?<\/p>\n<p>Japan\u2019s Nuclear Regulatory Authority Capitulates to<br \/>\nElectric Utility on Earthquake Assessment<\/h1>\n<p><\/center><\/p>\n<p>For immediate release<br \/>\nContact: Aileen Mioko Smith +81-90-3620-9251<\/p>\n<p>10 June 2013, Kyoto, Japan&#8212;-Today, Japan\u2019s Nuclear Regulatory Authority (NRA), in a complete about-face, yielded to Kansai Electric, the second largest utility in Japan at an NRA hearing assessing whether or not the only two nuclear power plants operating in Japan today, Ohi Nuclear Power Plant Units 3 and 4 would be allowed to operate after new regulatory standards come into force 17 July.<\/p>\n<p>NRA\u2019s \u201cOhi Nuclear Power Plant Status Assessment Hearing\u201d (Ohi Genpatsu no Genjo ni Kansuru Hyohka Kaigo) began on 19 April with the NRA requiring Kansai Electric to assess the earthquake motion that would occur at the Ohi plant when three earthquake fault lines located in close proximity to the plant would shift in unison, causing over 80 kilometers of earthquake fault to move. This signified that the plants would have to withstand a much more violent earthquake that they had been previously assessed to withstand with only two of the faults shifting in unison. The three-fault assessment was being demanded by the NRA based on the lessons learned from Fukushima where multiple faults moved in unison.<\/p>\n<p>Today, however, the NRA made no objection when Kansai Electric blatantly ignored the NRA\u2019s demands for a full three earthquake fault assessment, taking into consideration evidence that the earthquake would shift not only horizontally but vertically and placing the asperity* under the plant. Kansai Electric ignored all significant demands of the NRA, yet the NRA remained silent, behaving totally differently from its attitude in previous hearings. Instead, at the conclusion of today\u2019s hearing, the Nuclear Regulatory Agency declared that tomorrow\u2019s hearing will proceed with assessing the plant facility because \u201cwe are running out of time.\u201d  The assessment will no doubt be based on Kansai Electric\u2019s preferred earthquake motion description as given by the utility today. <\/p>\n<p>Six Japanese NGOs including \u201cGreen Action\u201d, \u201cMihama-no-Kai\u201d and the \u201cThe Nuclear Regulatory Authority Citizen Watchdog\u201d issued a statement protesting today\u2019s hearing. The statement (in Japanese) can be found at:<br \/>\n<a href=\"http:\/\/www.greenaction-japan.org\/modules\/wordpress\/index.php?p=653\">http:\/\/www.greenaction-japan.org\/modules\/wordpress\/index.php?p=653<\/a><\/p>\n<p>Download: <a href=\"http:\/\/greenaction-japan.org\/internal\/130610_GA_IPR_Ohi_NRA.pdf\">Is Japan headed for another Fukushima? Japan\u2019s Nuclear Regulatory Authority Capitulates to Electric Utility on Earthquake Assessment<\/a> (PDF)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Is Japan headed for another Fukushima? Japan\u2019s Nuclear Regulatory Authority Capitulates to Electric Utility on Earthquake Assessment For immediate release Contact: Aileen Mioko Smith +81-90-3620-9251 10 June 2013, Kyoto, Japan&#8212;-Today, Japan\u2019s Nuclear Regulatory Authority (NRA), in a complete about-face, yielded to Kansai Electric, the second largest utility in Japan at an NRA hearing assessing whether or not the only two nuclear power plants operating in Japan today, Ohi Nuclear Power Plant Units 3 and 4 would be allowed to operate after new regulatory standards come into force 17 July. NRA\u2019s \u201cOhi Nuclear Power Plant Status Assessment Hearing\u201d (Ohi Genpatsu no Genjo ni Kansuru Hyohka Kaigo) began on 19 April with&#8230;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"give_campaign_id":0,"_kadence_starter_templates_imported_post":false,"_kad_post_transparent":"","_kad_post_title":"","_kad_post_layout":"","_kad_post_sidebar_id":"","_kad_post_content_style":"","_kad_post_vertical_padding":"","_kad_post_feature":"","_kad_post_feature_position":"","_kad_post_header":false,"_kad_post_footer":false,"jetpack_post_was_ever_published":false,"_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":false,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2}},"categories":[17],"tags":[],"class_list":["post-33","post","type-post","status-publish","format-standard","hentry","category-our-impact"],"jetpack_publicize_connections":[],"jetpack_featured_media_url":"","jetpack_sharing_enabled":true,"jetpack_shortlink":"https:\/\/wp.me\/p9b8FX-x","_links":{"self":[{"href":"http:\/\/greenaction-japan.org\/en\/wp-json\/wp\/v2\/posts\/33","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/greenaction-japan.org\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"http:\/\/greenaction-japan.org\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"http:\/\/greenaction-japan.org\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/greenaction-japan.org\/en\/wp-json\/wp\/v2\/comments?post=33"}],"version-history":[{"count":1,"href":"http:\/\/greenaction-japan.org\/en\/wp-json\/wp\/v2\/posts\/33\/revisions"}],"predecessor-version":[{"id":263,"href":"http:\/\/greenaction-japan.org\/en\/wp-json\/wp\/v2\/posts\/33\/revisions\/263"}],"wp:attachment":[{"href":"http:\/\/greenaction-japan.org\/en\/wp-json\/wp\/v2\/media?parent=33"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"http:\/\/greenaction-japan.org\/en\/wp-json\/wp\/v2\/categories?post=33"},{"taxonomy":"post_tag","embeddable":true,"href":"http:\/\/greenaction-japan.org\/en\/wp-json\/wp\/v2\/tags?post=33"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}